Three jobs.
One coupled system.

A future deuterium–tritium power plant needs more than a hot plasma.

Follow the blanket system through fuel production, heat collection and shielding. These functions interact across an assembly and its supporting equipment.

A functional map / not to scale

Follow a neutron outward.

Functional view of a future breeding blanket systemNeutrons leave the plasma, cross the first wall and interact with the breeding region and coolant. A shield behind the module protects equipment. Tritium recovery and coolant circuits connect to external systems. Rectangles are a schematic of functions, not physical dimensions or universal layer ordering.D–T plasmaneutrons escapeFirst wallBreeding regionlithium-containing breeder+ coolant circuitShieldProtectedequipmentA schematic of functions, not an engineering layout
  1. D–T plasma Neutrons leave the plasma
  2. First wall
  3. Breeding region Lithium-containing breeder+ coolant circuit
  4. Shield
  5. Protected equipment

Select a job below. The diagram highlights the relevant function; the notes explain the external systems and evidence needed too. Material choices and geometry change the interactions.

Fuel / a complete loop

Make tritium available to the fuel cycle.

In a breeding blanket, fusion neutrons interact with lithium-containing material to produce tritium. Recovery and return to the fuel cycle are separate system requirements. Producing tritium locally is one step toward sustained fuel supply.

Evidence to ask for: Does the reported result cover just a material sample, or the recovery and return systems under relevant conditions? A component result alone cannot establish plant self-sufficiency.

Source: ITER’s tritium-breeding overview ↗

Heat / a path to useful power

Carry energy out through a coolant.

Neutrons transfer energy to the blanket. A coolant removes heat. A future plant would connect useful heat to a power-conversion system; heat removal itself does not demonstrate net electrical output.

Evidence to ask for: At what operating conditions was heat removal demonstrated? Does the stated result include conversion and the plant’s own power demand?

Source: ITER’s blanket overview ↗

Shielding / protect what must keep working

Limit radiation and nuclear heating beyond the blanket.

The system also protects structures and magnets. In ITER’s test blanket systems, a shield sits behind the test module. Breeder, coolant, shielding and supporting structures are related parts of an assembly.

Evidence to ask for: What exposure and operating duration does the result cover? How does that compare with the service life being claimed?

Source: ITER’s test-system description ↗

Read the claim / check the stage

Where is the evidence?

A future power plant must integrate the three functions and supporting systems. This map explains that requirement; it does not certify a particular design.
Design milestone

Four preliminary reviews

On 14 September 2026, ITER reported that four breeding concepts had passed preliminary design reviews that summer. It described fusion testing as planned work in its first D–T phase.

Next evidence

From review to operation

Engineering review, component measurements and an integrated operating system answer different questions. Our question is which conditions and interfaces each result actually covers.

Status checked 10 November 2026. Read ITER’s dated update ↗

Keep the distinction

ITER is a research machine.

Its standard blanket collects heat and provides shielding. Specialised test modules will investigate breeding. ITER’s main heat is sent to heat rejection; future power plants would need a power-conversion cycle. This diagram does not label the whole ITER blanket as a breeding blanket.

ITER: test modules and the future heat-to-power cycle ↗